SEAI Grants for Landlords in Ireland: What You Can Claim

SEAI grants for landlords are open on the same solar and battery terms as for owner-occupiers, with extra supports for certain HAP and RAS tenancies. At the time of writing November 2026, a private landlord can claim up to €1,800 for solar PV and €600 for a battery of 5 kWh or more, a combined €2,400 per home. The property must have an MPRN, must have been built and occupied before 2025, and must not have had previous solar PV funding at that MPRN.

What Can Landlords Claim Through SEAI?

The solar PV grant is calculated on system size: €700 per kWp up to 2 kWp, then €200 per kWp up to 4 kWp, capped at €1,800. The battery grant is a flat €600 for a battery of 5 kWh or larger. If you install both in one project, you apply once and the maximum is €2,400.

  • Solar PV: up to €1,800.
  • Battery: €600, for 5 kWh or more.
  • Combined solar and battery: up to €2,400.
  • Attic insulation for HAP or RAS tenancies: €1,400 to €2,500.
  • Cavity wall insulation for HAP or RAS tenancies: €900 to €2,300.
  • Boiler scrappage: €2,000 where an eligible fossil fuel boiler is replaced.

The SEAI solar PV grant page lists all homeowners, including private landlords, owner management companies and approved housing bodies as eligible applicants. The supports for landlords page covers the separate tax position. That is the key point for a landlord: the scheme is not limited to the house you live in.

Who Qualifies for the Solar and Battery Grant?

The tests are about the property, not the person's address. The home needs an MPRN, must have been built and occupied before 2025, and must not have had previous funding for solar PV at that MPRN.

  • The grant is one award per MPRN.
  • A home that already received solar PV funding cannot claim again at the same MPRN.
  • A battery can be added later if the solar was grant-funded before, provided the battery rules are met.
  • The battery must be at least 5 kWh.
  • The work must be done by an SEAI registered installer.
  • Approval must be in place before works start.

The before-2025 cut-off is important for landlords with older stock. A 1970s or 1980s rental is normally eligible, while a newly built 2025 apartment is not, even though it may be the better technical candidate.

What Extra Supports Exist for HAP and RAS Tenancies?

The enhanced measures introduced on 6 October 2026 added supports aimed at rented homes. The most valuable is the Dublin Rental Accommodation Scheme pilot, which offers up to €9,000 for solar PV and a battery in a home with a long-term RAS tenant.

Support Amount Who it covers
Solar PV and battery Up to €9,000 RAS pilot homes in four Dublin authorities
Attic insulation €1,400 to €2,500 HAP and RAS tenancies
Cavity wall insulation €900 to €2,300 HAP and RAS tenancies
Solar PV and battery (standard) Up to €2,400 Private landlords generally

Amounts correct at the time of writing November 2026. Grant values are subject to change.

The RAS pilot requires a letter from the local authority confirming that the tenant receives a RAS payment and that the property qualifies. The four authorities involved are Dublin City Council, Dún Laoghaire-Rathdown, Fingal and South Dublin.

One caution: the higher €9,000 grant for households on certain Department of Social Protection payments is generally tied to the homeowner living in the property. A landlord letting a home to a tenant on those payments does not normally qualify for that version, so do not budget for it without checking.

Can Landlords Claim the EV Charger Grant?

Yes, in the right circumstances. The SEAI home charger grant is up to €300 and is open where the charger serves a private residence with its own off-street parking. Rented accommodation use is allowed, so a landlord can install a charger for a tenant.

  • The charger must be within the property boundary.
  • The car must be parked off-street at the home.
  • The property cannot have had a previous home charger grant or a free ESB home charger before 2018.
  • It is one charger per MPRN.
  • The tenant needs to be able to use it safely and pay for the electricity.

For apartments and managed estates, the apartment charging grant is a different scheme. It covers up to 80% of infrastructure costs for owners management companies, plus €600 per charge point, with higher rates for local authorities and approved housing bodies. The scheme is fully committed for 2026 and is not accepting new applications for projects this year. Our guide to EV charging for rental properties sets out the practical steps.

What Does the Process Involve?

The sequence is the same as for an owner-occupier, with one extra layer of access and consent.

  • Get the tenant's agreement and arrange access before you apply.
  • Choose an SEAI registered company and get a written quote.
  • Apply for the grant and wait for the letter of offer.
  • The installer applies to ESB Networks, which usually takes at least 4 weeks or 20 working days.
  • Complete the works within 8 months of approval.
  • Arrange a post-works BER assessment.
  • Submit the declaration of works and supporting documents.
  • Payment usually arrives 4 to 6 weeks after the documents and BER are in.

The post-works BER is mandatory where solar PV is present, and it must be carried out by a registered SEAI BER assessor. Do not start the work before the grant offer arrives, because applications are not accepted for installations already begun.

Is It Worth It for a Rental Property?

The case is strongest where the landlord pays the electricity bill or where the property is hard to let. Solar and a battery reduce running costs, improve the BER and make the home more attractive in a competitive rental market.

  • A BER upgrade can support the property's positioning without relying on a rent increase.
  • A battery helps the tenant use solar in the evening, when demand is highest.
  • A charger adds a practical amenity for a tenant with an EV.
  • The grant reduces the capital cost, but the landlord still funds the balance.

The separate landlord retrofit tax deduction covered works carried out up to 31 December 2025, so it does not apply to a 2026 project in the same form. Check the current position with Revenue before you build it into a budget.

WattCharger's solar panel installation and battery storage teams handle the grant application, the ESB Networks notification and the BER handover for rental properties. Our guide to solar for landlords covers the wider investment case.

Frequently Asked Questions

Can a landlord get the SEAI solar grant?

Yes. Private landlords are eligible for the solar PV grant, the battery grant and the home charger grant, provided the property meets the MPRN, build date and previous funding tests.

Do I need the tenant's permission to install solar?

You need access and cooperation, and it is sensible to get written agreement before work starts. The grant application is made by the property owner or an authorised agent.

Can I add a battery to a rental that already has solar?

Yes, if the battery is 5 kWh or more, the home meets the eligibility tests and the grant is approved before installation. The battery can be claimed separately from the original solar grant.

Final Thoughts

SEAI grants for landlords are real, but they reward preparation. The property tests matter more than the landlord's own circumstances, the before-2025 cut-off rules out the newest stock, and the enhanced HAP and RAS supports are worth checking before you assume the standard €2,400 is the ceiling. Get the grant offer before anyone touches the roof, line up the BER early, and treat the tenant's access as part of the project plan rather than an afterthought.

Ready to Upgrade a Rental Property?

WattCharger designs and installs solar, battery and EV charger systems for landlords across Ireland, with the SEAI application, the ESB Networks notification and the BER handover handled for you. Book a free consultation and we will confirm what the property qualifies for before you commit. Start with our solar panel page or ask us about adding a battery to existing solar.

 

Blog Author: Rowan Egan